Cement Grout Pump, Pneumatic Pumps Pressure Grouting, Water Retaining Structures, Reciprocating Type Grout Pumps, Mumbai, India
  1. slider-bg1
  2. slider-bg2
  3. slider-bg3
  4. slider-bg4
  5. slider-bg5
 
  Home | About Us | Products | Projects | Contact Us | Enquiry
 

Cement Grout Pump, Pneumatic Pumps Pressure Grouting, Water Retaining Structures, Reciprocating Type Grout Pumps

OUR OTHER ACTIVITIES
channels CONSULTANCY IN CONSTRUCTION CHEMICALS
channels ENGINEERING & CONTRACTING
channels SEALANT APPLICATION
channels PRESSURE GROUTING BY HYDRAULIC / PNEUMATIC PUMPS
channels ALL TYPES OF HYBUILD / PROTECTIVE COATING EQUIPPED MANUFACTURING BASE FOR MECHANICAL ENGINEERING & EPE FOAM PRODUCT
 
contactus
 
WORK FORCE & EQUIPMENTS ----- A GLIMPSE

GROUT PUMPS RECIPROCATING TYPE. CEMENT GROUT PUMPS.
CAPACITIES 1Kg / SQCM TO 20Kg / SQCM. DELIVERY 1 BAG / HR TO 200 BAG / HR.

Cement grout pump.
Cement grout pump.
request

USED AT IPS-BANDRA TUNNEL & GHATKOPAR HIGH LEVEL TUNNEL.

HIGH DELIVERY RATE & LOW WORKING AREA.
DELIVERS 20 TO 50 BAGS /HR
AT 10KG/SQCM
EPOXY / P.U . TWO / THREE COMPONENT
request
EPOXY / P.U . TWO / THREE COMPONENT
GROUT PUMP.

AUTOMATIC DOZING. DELIVERS UP TO
2 LTRS / MIN.

PRESSURE
0 - 20 Kg/ SQCM.
MACHINE SPECIALY DEVELOPED FOR
LOW WORKING SPACE AREAS.


USED AT DHARAVI TUNNEL FOR DYWIDAG-
AG & BMC.


SCOPE OF MATERIAL SUPPLY AND EXECUTION
Sr. No. Description Supplied / Executed by
1
Expansion joint filler board Supply by Elcon products
2
Compressible Debonding strips Supply by Elcon products
3
Temporary seal of 8 mm rod Supply by Elcon products
4
Green concrete-saw grove 4mm X 110 mm Execution by Eff-tech
5
Widening of grove to 8 / 10 mm Execution by Eff-tech
6
Sealant application (silicon,P.U.,Polysulphide,etc) Execution by Eff-tech
7
Sealant (silicon,P.U.,Polysulphide,etc) Supply by Elcon products
8
Pre formed seal (Neoprene seal) Execution by Eff-tech
9
Pre formed seal (Neoprene seal) Supply by Elcon products

Schedule of grove cutting:

1. Initial cutting is carried out at green-concrete stage.
2. Final cut is done after 21 to 28 days.
3. Sealant is done on bone dry surface, generally after 1 or 2 days, i.e. between 30th and 35th day.

We help you in selecting & negotiating sealant manufacturers, also we optimize sealant consumption to suit & qualify various tests at site. We conduct field test on trial patch to technically ratify the sealant suitability.

We also undertake complete contract with sealant.